Student housing
“I loved my time living on campus, it was so much better than living on campus in my undergrad in many ways, including cost. I have been very happy here, and I’m so grateful for the staff that keep this building functioning so well! I would live here again in a heartbeat.”
NSCC Student 2023-24 Resident, Annapolis Valley Campus – COGS Campus Housing
NSCC is determined to increase housing capacity and emergency housing support for our students. Three new campus housing projects are currently underway with several prepared to open this coming fall. Each build will include one room for emergency housing.
In addition to current projects, four new student housing builds were announced for Cumberland Campus (September 2025), Lunenburg Campus (September 2025), Kingstec Campus (September 2026), and Institute of Technology Campus (September 2026).
The College has updated its admission processes with increased accessibility in mind to best support equity-deserving students at NSCC and reduce barriers they may face when applying for housing.
Housing projects underway (2 ready for September 2024)
New beds from ongoing/upcoming builds
Upcoming student housing builds
Total campuses to offer housing
Student housing
“I loved my time living on campus, it was so much better than living on campus in my undergrad in many ways, including cost. I have been very happy here, and I’m so grateful for the staff that keep this building functioning so well! I would live here again in a heartbeat.”
NSCC Student 2023-24 Resident, Annapolis Valley Campus – COGS Campus Housing
NSCC is determined to increase housing capacity and emergency housing support for our students. Three new campus housing projects are currently underway with several prepared to open this coming fall. Each build will include one room for emergency housing.
In addition to current projects, four new student housing builds were announced for Cumberland Campus (September 2025), Lunenburg Campus (September 2025), Kingstec Campus (September 2026), and Institute of Technology Campus (September 2026).
The College has updated its admission processes with increased accessibility in mind to best support equity-deserving students at NSCC and reduce barriers they may face when applying for housing.
Housing projects underway (2 ready for September 2024)
New beds from ongoing/upcoming builds
Upcoming student housing builds
Total campuses to offer housing